Bradley S59-2005 Mode D'emploi page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S59-2005T1
2
Connect Valve and Adjust Valve Temperature
A
Position valve with port labeled "UP" towards showerhead.
Connect valve to hot and cold supplies and showerhead or tub
spout supplies.
Turn on hot and cold supplies to pressurize valve and check for
leaks. (Valve will not operate unless both hot and cold supplies are
B
turned on.) Adjust maximum temperature using a 3/32" hex-head
Allen key. The range of the thermostat is 95° F to 115° F (35° C to
46° C).
Check the temperature when
approximately 2.5-4 GPM water
flow is reached (equivalent to
one shower).
3
Test Unit
Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off, check
to make sure the cold water is reduced to .5 GPM or less. If the cold water is reduced properly, reopen the hot water supply.
Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off, check
to make sure that the hot water flow has shut down. If hot water is shut down, reopen cold water supply. Test unit weekly for proper
function and desired set temperature.
4
Attach Escutcheon and Handle
The included foam rim seal may be applied to the back of
the escutcheon 1/4" from the outer edge, with the seam
at the bottom.
If the Rough-in Shield is used, remove the shield before
installing the escutcheon and handle.
4
"Back-to-Back" Installation
On the valve that is "backwards":
• Turn off hot and cold supplies.
• Remove (2) screws that hold down cap.
• Remove entire valve assembly from the valve body and
rotate 180°. Arrow on cap must point to HOT side. Re-install
screws.
DO NOT SKIP THIS STEP!!!
10/10/2012
This device must be checked for final temperature and
adjusted as necessary. The standard preset factory
temperature setting is 110°F (43°C). Consult proper
medical and/or safety authorities for the optimum
temperature recommended for your particular application.
Place the escutcheon and handle on the
A
wall over the valve and secure with the
screws provided.
H
C
Stop/Check Screws
Set Screw
UP
1/4"
Bradley • 215-1501 Rev. F; EN 12-03-009
Installation
1/4"

Publicité

Table des Matières
loading

Table des Matières