Zephyr VISTA ISLAND DVL-E36ASSX Manuel page 17

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. Position hole template on the ceiling
paying attention that the arrow is po-
sitioned on the same side as the range
hood controls.
- Make 3 holes in the ceiling and drive in screws without completely tightening
them. Pay attention not to insert the screw into the hole marked with an X on
the hole template.
3. Align the ceiling bracket with the
(3) screws previously installed in
the ceiling. Fig. 2
Rotate assembly slightly clockwise to
lock in place.
Tighten the 3 screws to secure the
structure in place.
- 17 -

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Vista island dvl-e42assx

Table des Matières