Drill your concrete substrate and install your 4 metal or chemical anchors dowels to secure your engine support
plate.
Skip all power cables and accessories.
Make sure using a level tool that the motor mouting plate is level.
Position your engine and bolt it with 2 screws provided.
Nylon racks fixation :
Nylon rack are producing by thermoplastic material with steel insert and adapted to the gates of a weight of 500
Kg maximum. They are easily mounted on the portal, by simple screwing. We provide you with the self-drilling
screws.
If your portal conception does not allow direct mounting racks, you must create a new support base :
To place the first rack, put it down respecting a 2 mm space between the engine's toothed wheel and the rack
as indicated on the scheme bellow :
Then draw your markings to screw self-drilling screw as shown below :
Drive
gear
Maintain
level tool
Draws
Piercing to
effectuate
-
Screw the self-drilling screw up the slot of your rack :
Support base
2 MM
ENGINE'S TOOTHED
WHEEL
drawing
Remarked
points
top
Never pierce
at the bottom
drawing
Remarked
points
Haut
bottom
Bottom
(Figure 4)
EN
27