Bradley S19-280D Installation page 3

Masquer les pouces Voir aussi pour S19-280D:
Table des Matières

Publicité

Installation
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes/ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for
Packing List
before discarding any packaging material. If any parts are missing, do not begin
IS
T H
E
S ID
installation until you obtain the missing parts.
U P
Flush the water supply lines before beginning installation and after installation
is complete. Test the unit for leaks and adequate water flow. Main water supply
to the eyewash should be "ON" at all times. Provisions shall be made to prevent
unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid.
Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa)
flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product, visit
bradleycorp.com or call 800-BRADLEY (800.272.3539).
Product warranties may also be found under "Products" on our web site at
bradleycorp.com.
NOTICE! For classic eye/face wash units, avoid cleaners containing organic solvents, alcohols,
and hydrocarbons. Rinse with water after cleaning.
Supplies Required:
Piping to ½" NPT water supply inlet on unit
Pipe sealant
Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.
Bradley • 215-1740 Rev. B; ECN 13-05-014
S19-280D, -280W, -290D, -290W, 274HDB, 274HWB, 274JDB, 274JWB
IMPORTANT
3/27/2013
3

Publicité

Table des Matières
loading

Table des Matières