Télécharger Imprimer la page

AERMEC CHU L Mode D'emploi page 12

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation example
B
C
The recessed CHU L box offers different options to carry out the water connections; they should comprise
three properly sized pipes (water inlet and outlet, condensate drain). The possible connection configurations,
illustrated in fig. 2, are:
A - pre-installation from the bottom. (recommended configuration)
B - pre-installation from the back.
C - pre-installation from the left.
The choice among these options depends on the solutions adopted for the construction of the hydraulic
system. It is, therefore, possible to choose the most advantageous solution on the basis of the various require-
ments.
12
Water connections
A
fig. 2

Publicité

loading