Installation Instructions
7.
Turn the screwed folding segments over and fix the rectangular tarpaulin with the self-drilling screws in the keder profiles.
8.
The completely assembled folding segments are now to be screwed to the four sides of the roof construction. Please make
sure that the fixing straps for the support tubes are tightened to where they are pointing inwards, towards the hay rack.
Caution: The screws must not be fully tightened! There must be a gap between the hinges and the tubes.
16x drilling screw 4.8 x 19
at all 4 corners of the tarpaulins
8x hexagon head screw M12 x 70
8x nut self-locking M12