Checks; Power Unit Mounting - ITW SIMCO ION LB - UNIT Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Installation

5.1. Checks

 Check that the power unit is undamaged and that you have received the correct version.
 Check that the data on the packing slip correspond with the data shown on the product
received.
If you have any problems and/or in the case of ambiguity:
Please contact Simco-Ion or your regional agent.
5.2. Installation
5.2.1. Summary
Install the power unit in the position you like within the range of the connection leads of the
ionisation equipment.
Install the power unit in such a way that the switches and indicator lamps are clearly visible and
easily accessible.
It is recommended that the power unit is switched on/off via the machine.
Important:
 Make sure that the equipment is properly earthed. Earthing is needed to ensure proper
operation and to avoid electrical shocks upon contact.

5.2.2. Power unit mounting

Check that the voltage shown on the rating plate corresponds with the mains voltage.
1. Remove the lid.
2. Attach the power unit using the fixing holes in the base plate.
For this purpose, remove the sealing caps.
3. Lay the connection cable to the (mains) voltage connection.
4. Connect the connection cable or fit a plug.
LB-Unit_UM_9752083410_NL_D_GB_F_V2_0
26

Publicité

Table des Matières
loading

Table des Matières