Sygonix 1911206 Notice D'emploi page 38

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Connect the two wires of the mains supply cable (L, N) to the
screw terminals "Input" and the two wires of the cable to the
device to the screw terminals "Output" on the built-in switch;
see wiring diagram (brown = L/phase, blue = N/neutral).
Installation
2
If you want to install the built-in switch, fasten it with the two
included screws or other suitable fasteners at the desired
location. The two installation holes are located next to the
strain relief under the two covers.
Ensure adequate ventilation at the mounting/in-
stallation location.
Finalising work
Replace the two casing covers.
The strain relief in the respective casing cover
must press on the outer cable insulation and not
on the two individual lines!
38

Publicité

Table des Matières
loading

Table des Matières