Sygonix 1911206 Notice D'emploi page 29

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Always consult an electrician!
*) Technical knowledge required to perform
the installation:
For the installation, the following specialist knowl-
edge is required in particular:
• The "Five safety rules": Disconnect from the
mains; protect against accidental switch-on; en-
sure there is no voltage; earth and short-circuit;
cover or protect neighbouring live parts.
• Use suitable tools, measuring devices and per-
sonal protective equipment, where necessary.
• Analyse measurement results.
• Use electrical installation materials to ensure
the turn-off criteria.
• IP protection ratings
• Install electrical installation materials
• Type of power supply (TN system, IT system,
TT system) and the corresponding connection
criteria (classic earthing, protective earthing,
necessary additional measures etc.)
29

Publicité

Table des Matières
loading

Table des Matières