4.
POWER SUPPLY CONNECTIONS
Close (if applicable) the mains supply valve (Fig. 1).
Connect the pipe for connection from the network valve to the
appliance (Fig. 1-2).
The pipes must be screwed firmly to their attach-
ment points.
Conduct a test to ensure that there are no gas leaks
once the network gate valve is open (Fig. 4).
Upon completion of the operations describe, close the network
gate valve (Fig. 3).
If it is necessary to replace the nozzle to conform to
another type of gas supply, see the procedure de-
scribed in the Operations for commissioning (ch. 5 -
section 5.3 and following).
4.2 GAS TYPE CHANGE
The appliance comes from the factory with setting to
the type of power indicated on the plate. Any other
configuration that changes the parameters set must
be authorised by the manufacturer or by its repre-
sentative.
The transformation from one type of power to anoth-
er must be performed by qualified technical person-
nel authorised to perform the operation in question.
The correct procedure to be implemented for the
transformation is described in the relevant manual.
Injectors - By Pass - Apertures - and anything
necessary for any gas transformation must be requested directly from the manufacturer.
At the end of the transformation from one type of power to another, change the label on the
appliance with new the parameters reported on the adhesive document provided.
Two plates may need to be replaced in certain cases (oven equipment), one outside near the gas
attachment and one inside.
BE-ES-FR-GR-IE-IT-PT-GB-LU
3B/P
THIS MANUAL IS THE PROPERT Y OF THE MANUFACTURER AND ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
G30/30 mbar
- 14 -
1/2" G
Fig. 2
Fig. 4
AL-AT-BG-HR-DK-EE-FI-DE-GB
GR-IE-IS-IT-LV-LT-LU-MK-NO
PL-PT-CZ-RO-SI-SK
ES-SE-CH-TR
2H - 2E
G20 20 mbar
FR-BE
2Er - 2E(S) G20/G25 20/25 mbar
HU
2H
G20 25 mbar
HU
14
1/2" G
Fig. 1
MAX 1,5 m
Fig. 3
3B/P
3B/P
3P
PT