Ingeteam INGEREV CITY Ground Manuel D'installation Et Usage page 33

Masquer les pouces Voir aussi pour INGEREV CITY Ground:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing and connecting the unit
3.
Close the back access and lock it with the key.
When the charging station is powered both sockets are lit. After briefly verifying its status, the light will switch
to green and the display will show an electric vehicle and the current time. The station is ready and awaits
identification from the user in order to begin charging.
If the station detects a fault, the lights of the corresponding socket or both (if both are at fault) turn red and
indicates the type of incident on the display "9. Operation").
ABA2020IQM01_B - Installation and Operation Manual
B
A
Ingeteam
C
33
EN
ES
FR
IT

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ingerev city duo

Table des Matières