10 Securing the Range
Mounting Hole
q
1. Confirm the range is level (side to side, front to rear)
and that the mounting holes are aligned at the front
of the range.
2. Secure the range by tightening a screw into each of
the four mounting hole locations.

7.5 Performing a Gas Pressure Test


WARNING: FIRE, EXPLOSION, AND/OR
BURN HAZARD. Failure to obey the following
warnings could result in death or serious
injury:
• Extinguish all open flames and do not smoke around
gas lines.
• Do not use the oven until the connection has been
leak tested and the connection does not leak.
• Leak testing must be conducted according to the
manufacturer's instructions.
EN
q
w
Screw
w
This section shows how to perform gas pressure testing
and gas leak testing prior to operating the range. When
conducting the range gas pressure testing prior to
operation:
• The range and any individual shut-off valves must
be disconnected from the gas supply piping system
when pressure testing the system at pressures
exceeding 0.5 psi (3.5 kPa).
• The gas supply pressure for checking the regulator
setting must be at least 1.0 in. W.C. (0.25 kPa) above
the manufacturer's specified manifold pressure. The
maximum gas supply pressure is 13.8 in. W.C (3.4 kPa).
11 Finding the Gas Regulator
Leak Check Fitting Screw
q
1. Make sure all control knobs are turned to the off
position, then turn on the gas.
2. Use a screwdriver to remove the leak check fitting
screw in the gas manifold.
3. Place a manometer on the fitting.
4. Check for leaks using 9–13.8 W.C. (2.2–3.4 kPa).
Installation