MBM PEG7750I Manuel D'installation Et D'utilisation page 38

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49
gate valve is open (Fig. 4).
Upon completion of the operations de-
scribe, close the network gate valve
(Fig. 3).
If it is necessary to replace the
nozzle to conform to another
type of gas supply, see the pro-
cedure described in the Operations for
commissioning (see chapter 5).
GAS TYPE CHANGE - see SECT.
IMAGES - REF. g)
The appliance comes from the
factory with setting to the type
of power indicated on the pla-
te. Any other configuration that chan-
ges the parameters set must be au-
thorized by the manufacturer or by
its representative.
The transformation from one type
of power to another must be per-
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POWER SUPPLY CONNECTIONS
formed by qualified technical personnel
authorized to perform the operation in
question. The correct procedure to be
implemented for the transformation is
described in the relevant manual.
must be requested directly from the
manufacturer.
with new the parameters reported on
the adhesive document provided.
attachment and one inside (see image
reference g).
- 12 -
Injectors - By Pass - Pilot injectors
- Apertures - and anything neces-
sary for any gas transformation
At the end of the transformation
from one type of power to another,
change the label on the appliance
Two plates may need to be repla-
ced in certain cases (oven equip-
ment), one outside near the gas

Publicité

Table des Matières
loading

Table des Matières