Health O Meter 597KL Mode D'emploi page 8

Masquer les pouces Voir aussi pour 597KL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

597KL/597KG/599KL/599KG ASSEMBLY INSTRUCTIONS (
4. Plug the load cell cable connector into the
load cell plug in the platform base. The
base of the scale has been designed to
provide wire management for the load cell
cable connector. Route the load cell cable
connector as shown.
5. After plugging in the load cell cable, slide
the section of plastic tubing surrounding the
cable upwards.
6. Tuck the cable and tubing into the
protective guide in the underside of the
scale platform. This holds the cable in place
and protects it from being damaged.
P/N UM597KL_KG 599KL_KG 752KL_KG REV20190416_Web
plastic tubing
tuck into
protective
guide
8
CONT.)
Load cell cable port

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

597kg599kl599kg752kl752kg

Table des Matières