Complete Installation - Elica FOGLIA Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Install transition on top of hood (if removed for shipping)
with 2 - 3.5 X 6.5 mm sheet metal screws.
A
B
A. Vent transition
B. 3.5 X 6.5 mm screw
For vented installations only:
Fit vent system transition place
Seal connetion with clamps.
Check tha brackdraft dampers work propely.
For non vented (reciculating) intallation only:
Assemble the air deflector with the duct cover bracket
with 2 - assembly screws provided with the Recirculatin
Kit.
B
A. Vent cover bracket
B. 2.9 X 6.5 mm screw
C. Deflector
Measure from the bottom of the air deflector to the bottom of
the hood outlet.
B
D
E
A. Air deflector
B. Vent clamp
C. X = length to cut duct cover
D. Duct cover
E. Exhaust outlet
A
B
C
A
C
X
Cut the duct to the measured size (X)
Remove the iar deflector
Slide the duct onto the bottom of the air deflector
Place the assembled air deflector and duct over the ex-
haust outlet from the hood.
Reassemble the air deflector to the duct cover bracket
with 2 assembly screws.
Seal connetions with vent clamps.
WARNING: Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result
in death fire, or electrical shock.
Mounting the duct cover
When using both upper and lower vent covers, push lower
cover down onot hood and lift upper cover to ceiling and
install with two 2.9 X 6.5 mm screws.
NOTE: For vent installations, the upper vent cover may be
reversed to hide slots.
D
A. Upper ducto cover
B. Lower vent cover
C. 2.9 X 6.5 mm screws
D. Bracket

Complete Installation

For non-vented (recirculating) installation only, install char-
coal filters over grille on blower housing. Install metal fil-
ters.
Check the operation of the range hood blower and light.
10
C
C
A
B

Publicité

Table des Matières
loading

Table des Matières