Télécharger Imprimer la page

BADU Jet smart Serie Instructions De Montage Et De Mise En Service page 39

Publicité

Les langues disponibles

Les langues disponibles

Final assembly of the BADU Jet smart unit
1)
After installation of the jet housing:
2)
Place the complete nozzle housing (102.1) against the jet housing (1).
3)
Slide pneumatic tube through protective conduit and seal up conduit with cable gland (20).
4)
Attach air tubing with clip (8) to air control valve (21)
5)
Fasten complete nozzle housing (102.1) with 4 self-tapping screws (95) on jet housing (1).
Attention: Tighten the self-tapping screws only by hand.
Do not use force.
6)
Connect jet pump (92) with threaded half-union (98, 99, 100), rubber elbow (79) and the
pertaining hose clips (75) to the suction and pressure tubes of the jet housing.
7)
Connect the pump motor as shown in the wiring diagram.
If a 3-phase AC supply is used, the correct sense of rotation must be ensured.
8)
The pump is switched on and off from the pool by means of pneumatic pushbutton (38/1).
9)
The air control valve (21) can be used to inject air into the water jet, if desired.
ATTENTION:
The jet housing is made of ABS. If the suction and pressure
tubes are to be glued into the housing when the housing
is already in place, a minimum hardening time of 12 hours
must be observed.
07.05.2008 TB-b bta badu jet smart_engl.indd
39

Publicité

loading