TS 5000 ISM EFS
6. 1 1
Mounting cover panels
85
120
+10
Max. 70
Clip on moving-leaf cover panel and fixed-leaf cover panel (
X
Shorten adjustable-size middle cover panel „A" to size „C" (
X
Clip on middle cover panel (
X
Insert inspection caps between cover panels (
X
7
Initial operation
7. 1
First Operation and Function Test
Switch on power
X
Open moving leaf >90° (door closer is in the freewheeling area).
X
Interrupt power supply (external function).
X
Door closes.
à
7.2
Functional test of closing sequence control
Open moving leaf.
X
Open fixed leaf and hold it open.
X
Moving leaf remains in waiting position of closing sequence control and also closes when fixed leaf is closed.
X
7.3
Testing for acceptance (only for use in a hold-open device)
An acceptance test must be carried out in order to ascertain the correct function and installation according to
the regulations once the installation has been completed on site. Acceptance test to be performed by authorised
personnel; see "Instructions for Installation, Commissioning, Operation and Maintenance of the GEZE Hold-Open
Device FA GC".
8
Maintenance, servicing, repairs
Regular servicing has to be carried out. For more information on this, please observe the document "Instructions
for Installation, Commissioning, Operation and Maintenance of the GEZE Hold-Open Device FA GC".
9
Technical data
For technical data, please observe the document "Instructions for Installation, Commissioning, Operation and Main-
tenance of the GEZE Hold-Open Device FA GC".
(5)
GF
2.).
.
B
D
C
(5)
A
1.).
Fig. 6.11.1).
4.).
Initial operation
85
SF
Fig. 6.11.1
GB 8