Télécharger Imprimer la page

Mm Pan Head Screws; Fig. 38 - Best IC35I90B Mode D'emploi

Publicité

Les langues disponibles

Les langues disponibles

28. Secure safety cables as shown in
Fig. 34.
A. Push cable through support rods
and into hood cavity.
B. Slide washer and cable clamp with
barrel nut onto cable.
Note: Barrel nut must be slightly
backed off of cable clamp and
pushed (spring compressed)
when sliding assembly onto cable.
C. Push clamp assembly all the way
to the top of the hood while push-
ing down on barrel nut. Fig. 35.
D. When assembly is all the way to
the top inside of hood, completely
tighten barrel nut.
E. Cut excess cable off.
29. Remove the upper flue mounting
screws and drop the flues to expose
the wiring box. Make final electrical
connections. Install the outlet box
cover with (2) 3.9 x 6 mm Flat Head
Screws and (2) 3.9 mm lock wash-
ers. Fig. 36.
30. Reinstall the upper flue covers with
(4) 3.9 x 9 mm pan head screws.
Fig. 37.
31. Attached the bottom flue covers.

Fig. 38.

3.9 X 9 MM PAN
HEAD SCREWS (4)
HEX NUT
NOTE: CABLE CLAMP ASSEMBLY
INCLUDES BARREL NUT AND
HEX NUT.
Clamp Assembly
Excess Cable
FIG. 37
FIG. 38
- 19 -
BARREL NUT
FIG. 34
FIG. 35
FIG. 36

Publicité

loading

Ce manuel est également adapté pour:

Ic35i90w