Télécharger Imprimer la page

Table Des Matières; Head Screws. Fig. 21 - Best IC35I90B Mode D'emploi

Publicité

Les langues disponibles

Les langues disponibles

FOR AEIC35SB KIT NON- DUCTED
FLUE VERSION
13. Assemble non-duct plenum to duct
cover rails with (4) 3.9 x 6 mm pan
14. Slide the flue cover rails on the
telescopic arms and attach to arm
brackets using (4) 3.9 x 9 mm flat

head screws. Fig. 21.

15. Install plastic duct connector into
non-duct plenum, then install the 6"
to 5" reducer and seal with duct tape.
Fig. 22.
16. Install 5"x 12.5" expandable duct and
seal with duct tape. Fig. 22.
17. Temporarily install upper flue covers
with (4) 3.9 x 9 mm pan head screws
(you will need to remove it when
making electrical connections).
Fig. 23.
Skip to Step 24.
2.9 X 9.5 MM PAN
DUCT CONNECTOR
FIG. 23
- 15 -
5" EXPANDABLE DUCT
6" TO 5" REDUCER
FIG. 21
FIG. 22

Publicité

loading

Ce manuel est également adapté pour:

Ic35i90w