Télécharger Imprimer la page

Power Fist 8558777 Manuel De L'utilisateur page 8

Publicité

Les langues disponibles

Les langues disponibles

V 4.1
OPERATION
The tool is shipped with the handle part detached from the tool body part.
Handle
Screw Bolt
Tool body
NOTE: Make sure all items listed in above picture are included in the package, if not, please
call: 1-800-665-8685
Follow these instructions to prepare the tool for using.
1.
Set the handle against the tool body.
2.
Put the screw bolt into the hole, then tighten the screw bolt with nut until the handle
are secured and locked against the tool body.
WARNING: If any parts are missing, do not operate this tool until the missing parts are
replaced. Before using this tool, make sure the handle part and the tool body part are
screwed together tightly. Failure to do so could result in possible serious personal injury.
LOADING CLEAT NAILS
Occasionally, a fastener may become jammed in the firing mechanism of the tool, making the
tool inoperable. To remove a jammed fastener, follow the steps below:
1.
Pull the Outer Magazine (A) back to the end of magazine. Place full clip of L Cleat (B)
into magazine. Up to 100 cleat nails can be loaded into magazine. (Fig. 1)
2.
Be noted that, when loading the L Cleat nails, the side with the L head should be in
the left.
3.
Push the Outer Magazine (A) forward until to the pop-up lock position.
8
2-in-1 Flooring Nailer and Stapler
Screw Nut
Prepare Flooring Nailer
For technical questions call 1-800-665-8685
8558777

Publicité

loading