Télécharger Imprimer la page

Oerlikon Barmag GA Mode D'emploi page 17

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 59
1.
Safety
1.1
Operator Instructions
Read these operating instructions before commissioning the pump.
1.2
Operating Instructions of the Operating Party
As operating party you are obliged to draw up operating instructions for your operations.
This applies especially when components, such as pumps, are supplied for an installation / a machine
and the supplied operating instructions are component specific.
The following section should facilitate the production of your own operating instructions.
In addition, you can order a service book for any type of pump from Barmag. Barmag also supplies train­
ing for service activities.
1.3
Foreseen Use
The adhesive pump / drum pump is intended for metering of liquid media (e.g.adhesives, sealing
compounds).
Operate the pump only within the limits designated in the pump‐data sheet
(see information in Chapter 7).
For safety reasons, no other or additional use is allowed. Such use may lead to increased risks for the
operating personnel.
Intended use includes observance of the operating instructions, especially of the repair instructions.
1.4
Qualifications of Personnel
Use only trained personnel for commissioning, operating, and maintenance of the pump.
1.5
Notes on Commissioning
After completing the installation and before each recommissioning of the pump, you must carry out a test
run including a check of the process parameters and all safety devices.
Kunde:
Basis
Auftrag:
000000-000
Ausgabe:
02.12
Seite
1

Publicité

loading

Produits Connexes pour Oerlikon Barmag GA

Ce manuel est également adapté pour:

Gx