Télécharger Imprimer la page

GEZE TS 5000 L-E-ISM VPK Instructions De Montage page 12

Publicité

Les langues disponibles

Les langues disponibles

Mounting and fixing
Mark out and drill fixing holes for door closer and guide rail using fitting template or cut M5 thread, if necessary.
X
Drill additional hole (A) for power supply 24V DC.
X
In case this product is in use with an hold-open device, please observe the document "Instructions for Installati-
on, Commissioning, Operation and Maintenance of the GEZE Hold-Open Device FA GC" as well.
CAUTION!
Damage to leaf!
Limit the maximal angle of aperture by means of door stop.
X
6.2
Mounting guide rails and covers
Remove 24 V fixed-leaf cable of the electrical hold-open device sideways from fixed-leaf guide rail (1.).
X
Align spacers at the moving and fixed leaf guide rails (2.).
X
Slide on adjustment pieces (3.) (ensure that the position is correct! Thread points towards hinge moving-leaf end).
X
Screw in regulating screw into adjustment piece on GF end (4.).
X
Fix guide rails in place (tightening torque: 2 Nm) (5.)
X
Screw down cover at moving leaf (tightening torque: 2 Nm) (6.).
X
Slide on end cap at fixed leaf (7.).
X
Insert cable fitting into GF cover and screw it tight with nut (8.).
X
Fix door closer (9.).
X
All screwing torques are to be adjusted on site, if necessary.
6.3
Preparation of electrical connection
Mount 2 x spacers (1.) and board (2.).
X
GB 4
TS 5000 L-E-ISM VPK
Fig.: 6.2.1
Fig.: 6.3.1

Publicité

loading