Mounting and fixing
Mark out and drill fixing holes for door closer and guide rail using fitting template or cut M5 thread, if necessary.
X
Drill additional hole (A) for power supply 24V DC.
X
In case this product is in use with an hold-open device, please observe the document "Instructions for Installati-
on, Commissioning, Operation and Maintenance of the GEZE Hold-Open Device FA GC" as well.
CAUTION!
Damage to leaf!
Limit the maximal angle of aperture by means of door stop.
X
6.2
Mounting guide rails and covers
Remove 24 V fixed-leaf cable of the electrical hold-open device sideways from fixed-leaf guide rail (1.).
X
Align spacers at the moving and fixed leaf guide rails (2.).
X
Slide on adjustment pieces (3.) (ensure that the position is correct! Thread points towards hinge moving-leaf end).
X
Screw in regulating screw into adjustment piece on GF end (4.).
X
Fix guide rails in place (tightening torque: 2 Nm) (5.)
X
Screw down cover at moving leaf (tightening torque: 2 Nm) (6.).
X
Slide on end cap at fixed leaf (7.).
X
Insert cable fitting into GF cover and screw it tight with nut (8.).
X
Fix door closer (9.).
X
All screwing torques are to be adjusted on site, if necessary.
6.3
Preparation of electrical connection
Mount 2 x spacers (1.) and board (2.).
X
GB 4
TS 5000 L-E-ISM VPK
Fig.: 6.2.1
Fig.: 6.3.1