IMPORTANT!
Risk of damage
• Drilled holes for laying cables must only ever
be drilled into the handlebars from one side.
Never drill all the way through the handlebars.
Never drill into the handlebars in the middle.
The permitted drilling positions are noted in the
type approval for aftermarket handlebars as
applicable.

4 | Installation

4.1 | Preparation

The vehicle is jacked up stably in a well-lit, clean place (either with
a paddock stand or the vehicle's own centre stand). The battery
must be disconnected before starting work (disconnect the minus
contact).
1
4.2 | Installation
First remove the two M4 bolts and the spring washers from the
switch unit (1). Then position the half with the buttons on the
18