INSTALLATION
BOILER FIXING
Put on the flange (1) the screw and two nuts, (see fig. 2).
Widen, if necessary, the insulating gasket holes (5), (see fig. 3).
Fix the flange (1) to the boiler door (4) using screws (2) and (if necessary) the nuts (3) interpos-
ing the insulating gasket (5), (see fig. 4).
Fig. 2
E9022
Fig. 3
D5012
Verify that the installed burner is lightly leaned
towards the button. (See figure 5).
The burner is designed to allow entry of the flexible
oil-lines on either side of the burner.
Fig. 4
1
5
1
2
D8058
3
GB
4
3
5
2
D5572
Fig. 5
2903360