Tools Needed
Pipe Wrench
Adjustable Wrench
Drill
Tape Measure
10" x 5/16" Nut Driver
Thread Sealant
Level
2-1/2" Diameter Hole Saw for 2" pipe
2" Diameter Hole Saw for 1-1/2" pipe
1" Diameter Hole Saw
Non-corrosive Leak Check Solution
Locating Wall Opening
Locate wall studs and move the wall furnace into position. The shroud
has many holes and can be mounted into 16 or 24 on centers studs.
A series of holes across the top of the rear shroud corresponds to
the mounting holes to aide in aligning the mounting holes with the
wall studs. When mounted directly on the floor, plastic anchors can
be used. Ensure that the vent and gas line openings will be located
between wall studs. Ensure the wall furnace is level, adjust legs on
the bottom of the unit if necessary. See Figure 29.
Use masking or painter's tape to mark the location of the two top
corners of the rear shroud against the wall. See Figure 30.
37873-0-0217
WALL FURNACE INSTALLATION
MOUNTING THE REAR SHROUD
Figure 29
Figure 30
Move the wall furnace away from the wall and remove the rear
shroud from the wall furnace. Remove four 10 x 1/2" hex-head
screws and set aside. Determine if using a direct vent, single flue
venting system. Place the rear shroud against the wall and mark
the vent and gas openings. For single flue installations, mark only
the left hole (as shown in Figure 31). For direct-vent installations,
mark the left and right holes. See Figure 31. The wall opening
required for intake and exhaust pipes is 2-3/8" in diameter within
the circles made above. If the wall furnace is to be wall mounted
above floor level, install per the instructions included with the wall
shroud kit listed on page 15.
Figure 31
Page 21