Before operating this appliance, carefully read the following.
1.
Verify the gas line service does not exceed the maximum and
minimum pressures. See Page 23.
2.
Check and inspect the appliance for gas leaks. In the event of
gas leaks, turn off the gas supply to the wall furnace immedi-
ately and call your gas supplier. Verify the gas line has been
purged.
3.
Verify that all exhaust and inlet air pipes are unobstructed and
properly joined.
4.
Visually verify the burner is free of dust and debris.
5.
Verify that all panels are secured in place and that the casing
front has been locked in position.
6.
Verify that the polarity of the connections are correct and the
line voltage power leads are secure.
7.
After verifying and checking all the above points, proceed to
lighting instructions. Refer to Page 33.
Notice: Verify any kits are installed per the instructions included
with the kit.
Page 36
WALL FURNACE INSTALLATION
STARTUP CHECK LIST
WARNING
Paint Curing - First Firing
The UltraSaver has been painted with the high quality heat resistant
silicon paint. To ensure that the paint is properly cured, allow the
wall furnace to operate on High, for approximately one hour. During
the initial firing of the appliance, it is common for smoke to appear.
DO NOT touch the surface of the wall furnace, the paint may
soften during the initial operation. Once the paint is cured,
it will not soften again.
•
To prevent triggering of smoke alarms, supply proper ventila-
tion to the room where the unit is installed.
•
DO NOT clean the wall furnace with any caustic or abrasive
cleaning solutions. This will damage the surface.
•
Any damage to the painted surfaces should be repaired only
with authorized paint available from your Empire Dealer.
CAUTION
37873-0-0217