Aprimatic ONDA 623 Notice D'installation Mécanique, D'utilisation Et D'entretien page 16

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

SLIDING GATES
3.
FITTING THE OPERATOR
Two methods for fi xing the operator to the ground:
A- by means of the foundation slab with 4 anchor log bolts,
sunk in cement (the foundation kit).
or:
B- directly fi xed to the terrain using screws or chemical
anchors. This method ONLY can be used if the area is
suffi ciently fi rm and fl at.
!
Warning
Other assembly methods where the motor base is not
horizontal are forbidden by the manufacturer.
The operator must be positioned with regard to the position
of the closed gate (Fig.7).
3.1 Fixing with the foundation kit
!
Warning
The support base for the foundations must be constructed
above the level of the surrounding ground level; if necessary
raise the level a few centimetres.
In very snowy zones or areas subject to flooding we
recommend positioning the plate 10-12 cm above the
ground surface.
!
Warning
It is essential that the foundation works be carried out
perfectly and that the plate be correctly positioned with
respect to the wing.
!
Warning
Leave the correct distance between the edge of the slab
and the gate surface (Fig.8).
Excavate a pit according to the dimensions given in Fig.8.
Fill the pit with good-quality cement.
Assemble the plate and position it with the log bolts into
the cement pit (Fig.9).
Caution
Check the horizontal position of the plate with a level.
.
Fig
7
gate
operator
90°
operator
opening
gate
operator
opening
gate
ONDA 623
.
Fig
8
2 0
gate
90°
.
Fig
9
1. To assemble the 4 threaded blocks.
2. To assemble the 4 log bolts
in order to obtain the height B.
B (mm)
10 min
20 max
3. Position the plate and
adjust the nuts.
- 16 -
A
A mm
180 max
70 min
plate
280
B
C h e c k
horizontal position
of the plate
Cable pipe Ø 35 mm
t h e

Publicité

Table des Matières
loading

Table des Matières