Test Procedure - ESAB PCC-10 Manuel D'instructions

Masquer les pouces Voir aussi pour PCC-10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SeCTION 4
4.2

Test Procedure

PCC-10
Test Procedure:
1. Connect as shown above using 3/8" (9.5 mm) ID hose.
2. Open throttle valve completely.
3. Fill PCC-10 with Plasmarc torch coolant.
4. Power on the PCC-10.
5. Adjust throttle valve until test pressure gauge reads 125 psig (8.6 bar). Gauge on PCC-10 should agree
within +/- 10 psig (.69 bar).
6. Read flow on test flowmeter. Reading should be at least 1.5 GPM.
7. Check interior of PCC-10 for leaks.
8. Drain torch coolant to the extent practical and reuse for testing the next unit.
Schematics and Wiring Diagrams on 279.4mm x 431.8mm
(11" x 17") paper are included inside the back cover of this manual.
Test
Pressure
gauge
Supply
return
figure 4.1 Test Procedure
NOTe:
Test flowmeter
Throttle Valve
26
MAINTeNANCe

Publicité

Table des Matières
loading

Table des Matières