ESAB PCC-10 Manuel D'instructions page 23

Masquer les pouces Voir aussi pour PCC-10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SeCTION 3
After filling the reservoir to the MAX mark, located on the front panel, run the pump with its cap removed in
order to purge air from the radiator, hoses, and torch. Re-check coolant level to ensure reservoir is filled to MAX
mark. Replace reservoir cap after purging and checking coolant level.
WArNINg
DO NOT CONNeCT hOSeS TO A SOleNOID VAlVe ThAT CAN Be
ClOSeD WheN The PuMP IS OPerATINg AS DAMAge TO PuMP CAN
reSulT.
23
INSTAllATION

Publicité

Table des Matières
loading

Table des Matières