 If no oiler is installed, the length of the air line to the tacker must
not exceed 10 m. Otherwise, three to five drops of PREBENA
special nailer oil must be filled directly into the air inlet of the
tacker every day prior to operation.
 The compressed air system must be able to maintain the
operating pressure even during the required air removal.
 The inner diameter of the air line must be at least 6 mm.
 The connection for the tacker must be equipped with a quick-
action coupling, ID 7.2, and have an inner diameter of at least 6.5
mm.
 Only operate the tacker on suitable compressed air systems.
 Only use the tacker if it is in perfect working order.
 Check the condition of the tacker (see page 13).
 Check the connection for the compressed air hose for foreign
matter and contamination and clean it if necessary.
 Set the operating pressure at the pressure regulator of the
compressor to 4.0 – 7.0 bar.
 Never direct the tacker at people or animals.
 Empty the magazine prior to connection.
CAUTION
Operation on compressed air systems that do not
meet the above-mentioned preconditions can lead
to damage to the tacker.
WARNING
Accidental triggering when connecting to the
compressed air supply can lead to serious or
even fatal injuries.