USING V.A.C. VERAFLO™ DRESSING IN CONJUNCTION WITH
BANDAGES, GARMENTS OR OFF-LOADING DEVICES
1. Follow instructions for creating a bridge as described in the Bridge Application with the V.A.C.
VeraFlo™ Dressing System section�
2. Ensure that the length of the bridge is long enough to place the V�A�C� VeraT�R�A�C�™ Pad outside of
the subsequently applied dressing, garment or off-loading device (Fig. 39)�
Fig. 39
Off-Loading
Boot
28