Broan Elite E64000 Serie Guide D'installation page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. PREPARE THE INSTALLATION (
D
I
O
UCTED
NSTALLATIONS
NLY
Cut-out the openings for duct (A) and power cable (B), in cabinet or wall, according to the direction of discharge chosen.
See figures below.
NOTE: For all internal blower hoods, the cut-out opening for house wiring can be made in cabinet bottom OR wall, no matter the
discharge chosen (vertical or horizontal).
V
ERTICAL DISCHARGE
H
W
OOD
IDTHS
30"
36"
42"
48"
H
ORIZONTAL DISCHARGE
H
W
OOD
IDTHS
30"
36"
42"
48"
V
ERTICAL DISCHARGE ONLY
3. INSTALL BACKSPLASH (OPTIONAL)
Backsplash must be installed before the hood shell because the hood shell covers the backsplash top mounting screws. In order to be able
to install the backsplash, make sure you have at least 18" clearance between bottom of hood and range control panel or cooktop. (See
instructions packed with backsplash.)
D
C
IMENSION
13"
16"
19"
22"
D
C
IMENSION
13"
16"
19"
22"
HD0258A
)
CONT'D
INTERNAL SINGLE BLOWER HOOD
CABINET BOTTOM VIEW
L C
C
A
3¾"
5¼"
5¼"
7/8"
INTERNAL SINGLE BLOWER HOOD
L C
C
5/8"
B
3¾"
A
5¼"
5¼"
HOOD WITH IN-LINE OR EXTERIOR BLOWER
5
CABINET CENTER LINE
7
48 " INTERNAL DOUBLE BLOWER HOOD
CABINET BOTTOM VIEW
B
5½"
2"
2"
3/4"
48" INTERNAL DOUBLE BLOWER HOOD
1/4"
2"
5½"
2"
CABINET BOTTOM VIEW
3½"
A
B
L C
4
3/8"
"
7 8
Ø 10½"
"
8
L C
22"
A
2"
10"
10"
2"
L C
22"
2"
B
2"
A
10"
10"
"
7 8
10¼"
B

Publicité

Table des Matières
loading

Table des Matières