Installation; Before Installing The Range; In The Commonwealth Of Massachusetts; Preparing For Installation - LG LRGL5825 Serie Manuel Du Propriétaire

Masquer les pouces Voir aussi pour LRGL5825 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Before Installing the Range

Make sure the range is properly installed and grounded by a qualified installer, according to the installation
instructions. Any adjustment and service should be performed only by qualified gas range installers or service
technicians.

In the Commonwealth of Massachusetts

• This product must be installed by a licensed plumber or gas fitter.
• When using ball type gas shut-off valves, they must be the T-handle type.
• When using a flexible gas connector, it must not exceed 3 feet in length.

Preparing for Installation

Tools Needed
Phillips screwdriver
Open-end or adjustable
wrench
Materials You May Need
• Gas line shut-off valve
• Pipe joint sealant that resists action of natural and LP gases
• Flexible metal appliance connector (
Never use an old connector when installing a new range.
• Flare union adapter for connection to gas supply line (
• Flare union adapter for connection to pressure regulator on range (
• Liquid leak detector or soapy water
• Lag bolt or
/
" O.D. sleeve anchor (for concrete floors only)
1
2
Flat-blade screwdriver
(simmer adjustment)
Diameter: 3/32" (2.4 mm)
L: 3" (76.2 mm)
Pipe wrench (2)
(one for support)
/
" or
/
" NPT x
/
" I.D.)
3
1
1
4
2
2
/
" or
3
4
L
Flat-blade screwdriver
/
" NPT x
/
" I.D.)
1
1
2
2
/
" NPT x
/
" I.D.)
1
1
2
2
INSTALLATION
13
Pencil and ruler
Level

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Lrgl5823 serieLrgl5821 serieLrgl5823sLrgl5825fLrgl5821s

Table des Matières