Acceptance test (in case of industrial/public use):
Before first use and after any significant modifications, the installation (including the electrical
connections) must be checked by a specialist.
A yearly check by a technical expert is necessary.
At least every four years, a quality inspection must be carried out by a technical expert.
Set up the fog machine observing the above safety notices or mount the fog machine with the installation clamp
on the ceiling, the wall or a suited traverse system. Make sure that the device cannot swing freely.
Attach the device with attachment materials suited for the attachment site, which are also suited to bear the load
of the fog machine.
Secure the installation with a suitable safety rope. The safety rope must be able to retain the device in case the
main suspension fails.
Align the fog machine horizontally and tighten the clamp screws well!
The maximum permissible tilt angle of 15° may not be exceeded.
b) Electrical Connection
If, after the fog machine is mounted, the mains plug is not accessible anymore or if it is
accessible but with difficulty, the voltage supply must be separated from the mains via an all-
pole switch.
Do not leave cables lying or hanging around; instead, install them in an expert manner to
prevent accidents.
Install the cable for the remote control up to the site from which you are going to control the device.
The back of the remote control is magnetic. The remote control thus sticks to metallic objects.
The mains plug must be plugged into an earthed power outlet to operate the device. However, do not plug the
mains plug in yet. Before connecting the device to the power supply, you first have to fill the tank with fog liquid
(see "Operation").