Nailer Operation; Loading Nails - Hitachi Koki NR 83A2 Manuel D'instructions Et De Sécurité

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

LOADING NAILS

WARNING
When loading nails into Nailer,
1) do not depress trigger;
2) do not depress push lever; and
3) keep Nailer pointed downward.
(1) Pull the nail feeder back until it latches.
(2) Insert nail strips one by one from above the magazine.
Two strips can be loaded at one time.
(3) Press the stop lever and slide the nail feeder forward
until it contacts the nail strip.
Nail Feeder
Nail Strip
Magazine
Stop Lever
Nail Feeder
— 12 —
NOTE:
Use nail strip at least 5 nails remaining.
Set heads of nails overlapped as shown in the below
figure.
Ensure that the head of tail nail is set under the nail
stopper of nail feeder.
Tail Nail
Nail Stopper
The Nailer is now ready to operate.

NAILER OPERATION

Read section titled "SAFETY"(pages 4 – 6).
DANGER
Operators and others in
work area MUST wear
safety glasses with side
shields which conforms
to ANSI Z87.1
specifications.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Nr 83a2 s

Table des Matières