12
MOUNTING- CHAIN MOUNT
VHR200R-EC - Optional
1 Place fastening hooks on
the strapping board or
the floor joists.
INSTALLING DRAIN LINE
Through normal operation and during its defrost mode, the HRV may produce some condensation. This water should flow into a nearby drain, or be taken
away by a condensate pump. The HRV and all condensate lines must be installed in a space where the temperature is maintained above the freezing point.
A "P" trap should be made in the drain line. This will prevent odors from being drawn back up into the unit.
The drain nipple is placed upside down in the unit to prevent it being damaged during shipping or the installation of the unit.
1 Remove the nutsert.
2 Attach a hanging chain
(provided) to each 19 mm
(3/4") bolt (provided) in the
top 4 corners of the unit
and tighten.
2 Invert the drain nipple. Make
sure to place gasket between
the unit and the drain nipple
inside the unit.
3 Hang the unit by slipping
a link onto the hanging
hooks, making sure the
unit is level.
3 Secure the drain nipple using
the nutsert.
* Alternative options for a "P" trap can be
used such as 1/2" PVC tubing or other
materials. (Not included)
4 Install a spring on each
chain. Hook the spring
in the links so a loop is
created in the chain. The
spring will then support the
unit's weight and absorb
vibrations.
4 Install the drain hose making a
"P" trap, secure the
condensate line drain
connection using the tube
clamp provided.
Fill the condensate line with
water.
2" (50mm) min
1" (25mm) min