Bradley 500 Serie Manuel D'installation page 27

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
9a
Urinal Screens with Continuous Stainless Steel Brackets (Optional)
Before installing the urinal screen components, determine the correct location for your application.
Brackets are used as templates, but since the hole patterns may be different, the brackets
may not be interchangeable.
Draw a plumb line on the wall to represent the urinal screen
A
centerline . Measure from the highest point in the room and place
a mark on the urinal screen centerline at dimension "A" for the
respective urinal screen height (see table below) .
Place the bottom of the bracket on the mark and center the
opening on the urinal screen centerline . Using the bracket as
B
a template, mark the hole locations on the wall . Remove the
bracket and drill a Ø5/16" hole (minimum 2" [51mm] deep) at
each hole location .
C
Insert plastic anchors in all holes and secure bracket to the wall
with the #14 x 2" stainless screws provided .
Place the urinal screen at dimension "B" for the respective
D
urinal screen height (see table on right) and insert it into the wall
bracket until a 1" (25mm) gap between the wall and urinal screen
is established .
Using the bracket as a template, drill Ø3/16" holes through the
E
urinal screen at each bracket hole . Secure the urinal screen to
the bracket with the #14 x 5/8" stainless screws provided .
Bradley • HDWT-INSTR-010 Rev F; ECN 17-14-007
Powder Coated & Stainless Steel Restroom Partitions, Floor-Braced — Series 500
42" Urinal Screen
48" Urinal Screen
Urinal Plumb Line
Dim "A"
18-1/2" (470mm)
12-1/2" (318mm)
3/22/2018
"B"
"A"
Dim "B"
18" (457mm)
12" (305mm)
27

Publicité

Table des Matières
loading

Produits Connexes pour Bradley 500 Serie

Table des Matières