Installation
7b
Stainless Steel Flat Hinge
See Step 1 for instructions on
laying out pilaster plumb line.
From the highest point in the room, measure 12"
A
(305mm) and 68-3/8" (1737mm) from the floor . Use a
level to transfer these marks to the pilaster plumb line .
Position the bottom of the bottom flat hinge on the
12" (305mm) mark and center on the pilaster plumb
B
line . Using the flat hinge as a template, mark the
hole locations on the wall . Remove the flat hinge and
drill a Ø1/4" hole (minimum 2" [51mm] deep) at each
hole location .
Position the top of the top flat hinge on the 68-3/8"
(1737mm) mark and center on the pilaster plumb
C
line . Using the flat hinge as a template, mark the
hole locations on the wall . Remove the flat hinge
and drill a Ø1/4" hole (minimum 2" [51mm] deep)
at each hole location .
Insert plastic anchors in all holes and secure the
D
flat hinges to the wall with the #10 x 2" stainless flat
head screws provided .
E
See step 7, D thru F for instructions on attaching the
door to the hinge .
Bradley • HDWT-INSTR-010 Rev F; ECN 17-14-007
Powder Coated & Stainless Steel Restroom Partitions, Floor-Braced — Series 500
Pilaster Plumb Line
(1737mm)
12"
(305mm)
3/22/2018
68-3/8"
21