Installation
5c
Telescoping Pilasters (Optional)
Mounting channels are used as templates but may not be interchanged because the hole patterns may be different.
Wall: From the highest point in the room, measure 12-1/8"
(308mm) up from the floor and transfer this level line to
the pilaster plumb line . Place the bottom of the mounting
channel at the level line and center the channel opening on
A
the plumb line .
Pilaster: Measure 1/2" (13mm) down from the top of the
pilaster and place a mark on the pilaster centerline . Place
the top of the mounting channel at this mark and center the
channel opening on the centerline .
Wall: Using the mounting channel as a template, mark the
hole locations and remove mounting channel . Drill a Ø5/16"
B
hole (min 2" [51mm] deep) at each hole location .
Pilaster: Using the mounting channel as a template, mark
the hole locations and remove the mounting channel . Drill a
Ø1/4" hole through the pilaster .
Telescoping Pilaster at Wall
Mounting Channel
Pilaster Plumb Line
Floor
Bradley • HDWT-INSTR-010 Rev F; ECN 17-14-007
Powder Coated & Stainless Steel Restroom Partitions, Floor-Braced — Series 500
Telescoping
Channel
Specified
Dimension
12-1/8" (308mm)
to Bottom
of Channel
(Highest Point in
Floor)
Wall: Insert the plastic anchors in all holes and secure
the mounting channel to the wall with the #14 x 2" screws
C
provided .
Pilaster: Secure the mounting channel to the pilaster with
the #10-24 x 3/4" barrel nuts and the #10-24 x 1" shoulder
screws provided .
Slide the telescoping channel over the mounting channel .
D
Refer to the submittal drawings and adjust the width to
meet the specified dimension .
Using the holes in the telescoping channel as a template,
E
drill Ø3/16" holes through the mounting channel . Secure the
telescoping channel to the mounting channel with the
#14 x 5/8" screws provided .
Wall, Pilaster or Panel
Mounting Channel
Telescoping Pilaster at Pilaster
1/2"
(13mm)
Mounting Channel
3/22/2018
Pilaster
Centerline
13