Diodetest; Frequency/Duty Cycle - Klein Tools CL800E Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DIODE TEST
1. Insert the RED test lead into the VΩ jack
test lead into the COM jack
switch
to the Continuity/Resistance/Diode test
2
NOTE: The meter will default to continuity testing in this mode.
Press the 'SEL' button
The Diode icon
2. Touch the test leads to the diode. A reading of 200-800 mV on
the display indicates forward bias. 'OL' indicates reverse bias.
An open device will show 'OL' in both polarities. A shorted
device will show approximately 0 mV.
Black lead Red lead

FREQUENCY/DUTY CYCLE

1. Insert the RED test lead into the VΩ jack
test lead into the COM jack
switch
to the Frequency/Duty cycle
2
NOTE: The meter will default to frequency testing in this mode. To
enter Duty-cycle testing mode, press the 'SEL' button
that the appropriate icon (either Hz or % ) appears on the display.
2. Measure by connecting the test leads across the circuit.
Black lead Red lead
CAPACITANCE
1. Insert the RED test lead into the VΩ jack
test lead into the COM jack
switch
to the Capacitance
2
OPERATING INSTRUCTIONS
4
twice to enter Diode testing mode.
9
will appear on the display.
4
4
5
, and rotate the Function selector
5
, and rotate the Function selector
5
, and rotate the Function selector
setting.
and the BLACK
setting.
and the BLACK
setting.
once. Ensure
9
and the BLACK
13

Publicité

Table des Matières
loading

Table des Matières