Dimensions and Cabinet Requirements
Cabinet requirements vary depending on the model to be
installed. Please consult the "Cabinet Dimension
Requirements" section at the back of this installation
manual for the details pertaining to your particular model.
Removing Packaging
NOTICE: To prevent damage to your floor keep the unit
in its packaging base until ready to be placed in the
cabinet opening. Do not slide the unit across the flooring.
Different models use different packaging materials.
Actual brackets may look differently. Bracket remains in
packaging base.
1.
Cut straps on outside of box.
2.
Remove cardboard box.
3.
Remove all top and side cardboard and Styrofoam
braces.
4.
Place oven in front of cabinets where it is to be
installed.
5.
Unscrew unit from Left and Right Brackets as show in
"Left and Right Packaging Bracket Removal".
Left Packaging Bracket Removal
All models require:
¼" (6.4 mm) space between the side of the oven and
▯
an adjacent wall or cabinet door when installed at the
end of a cabinet run.
Installation of 2x4's extending front to back flush with
▯
the bottom and side of the opening to provide oven
support. This supporting base must be well secured to
the floor/cabinet and must be level.
The electrical conduit box must be located above the
▯
unit to facilitate connecting and servicing the unit.
The cabinet base must be flat and capable of
▯
supporting the weight of your oven when in use (varies
by model up to 429 lbs. (195 kg)). See the
appropriate weight for your model in the "Cabinet
Dimension Requirements" section at the back of this
installation manual.
Right Packaging Bracket Removal
7