Testing - Ferroli GE3 Instructions D'utilisation, D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GE3

5. Testing

5.01 Before the fi rst light of the boiler
Before the fi rst light of the boiler follow these check list:
a)
check the system is fi lled with water at the right pressure;
b)
check against any leakage of water fuel;
c)
check that the correct electric power is supplied to the unit;
d)
check size and perfect fl ue in stal la tion;
e)
check against any type of fl am ma ble materials where the boiler is installed;
f)
check the burner has the right heat input according to the boiler size;
g)
control that the water valves are open.
5.02 First lighting
After the boiler preliminaries check ing , the appliance can be lights in the following way;
1) Open the fuel gate valve.
2) Set the regulating thermostat at the required temperature level.
After above operations the burner will start to run and the boiler will begin to work.
5.03 After the fi rst lighting
After the fi rst lighting it is advisable check:
burner works properly, this check ing must be done by appropriate instruments.
Thermostats operate correctly.
Water fl ows through the system.
Smoke gases evacuate through the fl ue duct.
5.04 Switch off
To turn off the unit for a short period it is enough to switch off the switch 4 (fi g. 1) on the control panel.
If the boiler has to be stopped for long period beside to act by the switch 4, it is necessary to cut the supply of fuel
by mean of the gate valve, in winter season, to avoid damages due to the frost it is necessary to add the antifrost
liquid in the system or to drain it completely.
Cod. 3540Z970 - 09/2011 (Rev. 00)
7

Publicité

Table des Matières
loading

Table des Matières