MetalTech CLIMB-N-GO I-CNG Instructions De Montage Et Consignes De Sécurité page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
13. Secure the multidirectional joystick control to the top of the guardrail or to a rung
of the scaffolding. Connect its cable to the one from the box.
14. Complete the installation of the multidirectional control by fixing its cable to the
scaffolding using the magnetic clips.
NOTE: To install the multidirectional control on the rungs of a BuildMan scaffolding
(I-BMSS), unscrew and reverse the S-bracket.
13
14
9

Publicité

Table des Matières
loading

Table des Matières