Mountfield AZURO 240 Notice De Montage Et D'utilisation page 22

Piscina ronde hors sol
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
EN
Remember: A strip of 30 cm of width around the circle must be in perfect level (see Fig. 2-9). The
bottom edge of the pool's side must be in level and must not lie on top of a depression. Pay attention
to make sure the area is absolutely plane and in perfect level.
PART 3 – SETTING UP THE SWIMMING POOL
STEP A - ASSEMBLY OF THE FOUNDATION OF THE SWIMMING POOL
1. SET UP THE BOTTOM FRAME OF THE SP
a. Space the coupling connectors evenly along the cir- cumference of the pool. While doing so, place
each time an arched lower bar (3) between every two coupling connectors (2) (see Fig. 3-1).
b. Insert the ends of the lower bars into the coupling con- nectors all the way down. You will thus make
lower frame of the pool.
c. Make sure that the bottom frame actually forms a cir- cle by measuring the distance from the central peg.
2. SPREAD FINE SAND
a. Spread a layer of no more than 2 cm of fi ne sand (opti- mally for stucco mortar) throughout the are-
as of the SP (except for the outer 30 cm of the circle) for an easier levelling of small unevenness places
on the ground (see the Fig. 3 –2). Do not spread the sand close to the bottom rails as it could get to the
guiding groove and make the erection of the wall impossible. A circular strip, width 15 cm, along the
side of the bottom rails should be left free of sand. Level the area with a rake so that the surface was fl
at and smooth.
Note: A thicker layer of sand may have adverse impacts upon the stability of the SP in future.
b. Supply approx. 0.2 to 0.3 cubic metre of sieved pit sand or soil to the surface of the base of the SP.
You will need to form the corner fi ll (see the chapter Form the corner fi ll).
Note: During the sand handling, take care to avoid any damage to the bottom frame or its coverage
with sand.
STEP B – ASSEMBLY OF THE WALL OF THE SWIMMING POOL
1. ERECT THE SP WALL
a. Wait for a calm sunny day. Do not try to erect the wall of the SP when windy. Invite at least one adult
person to help you.
b. Unroll the rolled wall of the SP and put on the area of the base of the SP on a piece of plywood (see
Fig. 3-3). Openings made for the skimmer have always be positioned at the top of the wall.
Important: Before unrolling the wall make sure what is the direction the wall is to be rolled in. Depending
on it, unroll the wall either to the left or to the right.
c. Start unfolding the wall (1) while directing its bottom edge into the lower frame. The beginning of
the wall must be above one of the coupling connectors (see Fig. 3-4) and the openings for the dirt
collector and return nozzle must be close to where the fi ltering equipment will be installed.
d. Proceed around the whole base until the whole wall is unfolded and inserted into the lower frame.
2. FIX THE ENDS OF THE WALL OF THE SP TOGETHER
a. Align openings in two ends of the wall against each other.
Aid: Put your screwdriver through two opposite openings in order to align the ends of the wall.
b. To bring the openings against each other, enlarge or diminish the circle of the wall of the SP by pu-
shing with your leg the bottom frame out or to the centre of the circle (see Fig. 3-5).
• 22 •

Publicité

Table des Matières
loading

Produits Connexes pour Mountfield AZURO 240

Ce manuel est également adapté pour:

Azuro 300Azuro 400

Table des Matières