Initial Operations; Setup Instruction; Power Supply - Soehnle 3010 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.
Initital Operation

6.1 Setup Instruction

Before connecting the power plug to the mains, make sure that the power supply specified on the rating
plate complies with local conditions. Protect the terminal by selecting an installation site that is not
subject to shocks, vibrations, intensive heat or cold, draughts, chemicals or moisture.
After power-on, the measured values stabilise after a warm-up period of 30 minutes.
Place the scale on a firm and level surface.
f
f
Make sure that cables or other objects are not pinched under the scale.
f
f
Align the scale by undoing the foot screws.
f
f
The air bubble in the spirit level must be right in
the center of the circle.
For setup locations in Germany, this condition has been met when the floor meets the tolerances
specified by DIN 18202 Table 3 row 4. For other countries, the respectively applicable standards
may have to be referenced.
Install the terminal or mount it on the wall by using the optional bracket.
f
f

6.2 Power Supply

Depending on the model, the terminal is either powered by a mains unit or by rechargeable batteries.
Only for the battery version:
1.
Insert the power supply cable into the connecting socket of the terminal (see page 36).
2.
Plug the mains unit into a power supply socket.
Make sure that the power outlet remains easily accessible.
3.
Charge the rechargeable battery for 10 hours prior to initial startup.
38

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

3010 (ip40)3010 (ip67)

Table des Matières