Chapter 3 Installation of the OTU-8000
OTAU ports
30
2 Connect every fiber to be tested from the ODF to each testing port
on the OTAU.
OTAU (Internal schematic view from
above)
ODF
Fig. 27
Internal schematic view (from above) of an integrated 1 to
24 optical switch (OTAU)
Case B: two OTDRs are used
1 Use both supplied jumpers to connect each OTDR respectively to
C1 and C2.
2 Connect all fibers to be tested to each testing port on the OTAU.
OTAU (Internal schematic view from above)
ODF
Fig. 28
Internal schematic view of a 2 to 24 optical switch
User Manual
7OTU80010/06
Connections to do
OTDR
OTDR 1
OTDR 2
Connections