Chapter 1 Prerequisites and delivery of the OTU-8000
Delivery of the OTU-8000
Connection to
the OSU-9600
Connection to
the OSU
Power cable and command
cable OSU <-> OSU
Launch Fiber Option
OTDR Option
12
Connection to the
Command cable OTU <-> OSU
(250 cm or 35 cm)
Power cable OTU <-> OSU
(40 cm)
Fig. 13
The launch fiber module is delivered with 19'' brackets mounted or it
can be delivered with 21'' or 23'' brackets according to your order. The
screws to fix the module into the rack are also delivered.
NOTE
You must have a POZI Screwdriver N°2 and thread lock.
Launch Fiber
bracket 21''
Launch Fiber
bracket 23''
Fig. 14
The OTU-8000 can be delivered with 1 or 2 OTDR plug-in(s). On
delivery, the OTDR plug-in is already set into the OTU-8000.
The manual is delivered with the OTDR (E8100M01: French /
E8100M02: English / E8100M03: German).
User Manual
OTU-8000
Connection to
the OTU-8000
OSU bracket
for 21'' rack
Delivery with the OSU-9600 option
Kit ot fix Launch Fiber
module into rack
Launch Fiber module
7OTU80010/06
OSU-9600
Jumper OTU <-> OSU,
with the correct connector
OSU bracket
for 23'' rack
Launch Fiber Chassis