Installation Scheme - Bayrol Automatic SALT Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Water values
3
Procedure for indoor pools
After the pH value is set please manually add chlorine
(Chloryte
/Chlorifix
) until you can measure a chlorine value
®
®
(DPD1) of 0.6 – 1.2 mg/l throughout the pool.
Procedure for outdoor pools
Before adding chlorine to the pool, the level of stabilizer
must be set. The UV light of the sun causes a premature
degradation of chlorine. To protect the chlorine from getting
destroyed a stabilizer (BAYROL Stabichloran
Effect of the stabilizer
Part of the chlorine added to the pool or produced by the
Automatic
is immediately available as free chlorine for
SALT
disinfecting the pool water. The rest is bound to the stabilizer
and thereby safely protected.
IMPORTANT
It is most important that you keep the level of stabilizer
stable throughout the season! Changing levels of stabilizer
will cause incorrect readings for disinfection (mV) of your
Automatic
!
SALT

Installation scheme

4
Further installation options
) must be used.
®
1 = Inlet
2 = Outlet
After the level of stabilizer is set you may start with manually
adding chlorine.
Please note
The manual chlorine measurement (e.g. with BAYROL Elec­
tronic Pool Tester or test kits) displays the sum of free and
protected chlorine at the same time. The automatic determi­
nation of the disinfection capacity of your Automatic
only takes the content of free chlorine into account. The pro­
tected part of the chlorine remains disregarded.
Therefore:
In the presence of stabilizer, the manually measured chlorine
value (DPD1) needs to be higher than without stabilizer.
Please manually add chlorine (Chloryte
can measure a chlorine value (DPD1) of 1.5 – 3.0 mg/l
throughout the pool.
SALT
/Chlorifix
) until you
®
®
31

Publicité

Table des Matières
loading

Table des Matières