5- Installation Of The Reefing Line; 6- Adjusting The Furling Line Guide; 7- Fitting The Pre-Feeder (Lx/Rx Ranges) - Facnor Torlon LS Serie Notice De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

5- INSTALLATION OF THE REEFING LINE

Y
6- ADJUSTING THE FURLING LINE GUIDE (LS RANGE)
Z

7- FITTING THE PRE-FEEDER (LX/RX RANGES)

For the LX/RX ranges, we supply one pre-feeder that helps to guide the sail while hoisting.
7
1 .
7.1- Wind the « vectran » loop twice round the telescopic section.
7.2- Pass the pre-feeder through the loop as shown.
7.3- Position the pre-feeder at the suitable height and pull tight. Once the sail is fitted, loosen
the loop and remove the pre-feeder. Store for future use.
F a c n o r - L S / L X / R X r e e f i n g a n d f u r l i n g s y st e m s - I n s ta l l a t io n ma n u a l
28
5.1 Positioning the front deck block
The furling line should be installed as shown.
The furling line should run off at 90° to the forestay and
through the stainless steel guide (fig. X).
(If the line does not run within the guide, please see
X
paragraph 6.1 below)
Fit the front deck as far as possible from the drum. The
furling line should run at 90° to the foil sections with the
line situated at mid-height round the drum as shown.
5.2 Setting the reefing line up
IMPORTANT: First half hitch the furling line (fig. Y)
around the body of the drum. Then, feed the line
through the hole in the top plate and tie a figure eight
knot as shown.
when the sail is furled up, there should be always a few
turns remaining around the drum
6.1 Slightly loosen the screw (fig. Z) so that the guide
can rotate.
BEWARE: DO NOT REMOVE THE SCREW.
6.2 Orientate the guide by pulling the furling line up.
NOTE: For RX/LX ranges, adjust the furling line guide when
tightening the two lower screws of the drum (see Rep C' on
page 14)
7
2 .
.
furl a few extra turns around the drum.
.
7
3 .

Publicité

Chapitres

Table des Matières
loading

Table des Matières