7.
Drop cast iron fret into place by sliding the bolts into the
slots of the fret brackets on the inner casting. Adjust bolts
as necessary for a tight fit.
8.
Hook the ash pan to the fret.
9.
Insert one hinge pin, long side up, in one of the bottom
hinge brackets on the backing plate.
10.
Drop the bottom of one door onto the hinge pin.
11.
Align the top of the door under the upper hinge bracket.
Drop the top hinge pin through the bracket, in the door
frame. Repeat with the other door.
12.
Adjust top heat baffle by pulling it forward until it lines
up with the flange of the top part of the backing plate.
Tighten the screws.
4
Section View of
the 612DKA Kit--
Right Side View
Backing Plate Top
Backing Plate Flange
Heat duct must be
adjusted to be flush
with protuding flange
of backing plate
Heat Duct
Backing Plate Left Side
Inner Casting
Front of fireplace
Drywall (534)
Non-combustible (535)
68 mm long Flange
31-1/4"
from floor
534/535 Black Frame
534/535 Engine